US NRC Begins Special Inspection at Dresden Nuclear Power Plant

By Reuters News

- US Nuclear Regulatory Commission:

  • SAYS IT BEGUN A SPECIAL INSPECTION AT THE DRESDEN NUCLEAR POWER STATION IN MORRIS, ILLINOIS OPERATED BY CONSTELLATION ENERGY

  • SAYS INSPECTING THE STATION AFTER PLANT STAFF FOUND A CORRODED BATTERY CONNECTION THAT BROKE DURING MAINTENANCE

  • SAYS THE BATTERY IS PART OF A BACKUP POWER SYSTEM THAT SUPPORTS EQUIPMENT USED TO SAFELY SHUT DOWN THE REACTOR

  • SAYS IT DETERMINED A SPECIAL INSPECTION WAS WARRANTED BECAUSE THE DAMAGE WAS NOT CAUGHT DURING ROUTINE CHECKS, AND SIMILAR BATTERY PROBLEMS HAVE OCCURRED AT OTHER NUCLEAR PLANTS

Capital.com is an execution-only brokerage platform and the content provided on the Capital.com website is intended for informational purposes only and should not be regarded as an offer to sell or a solicitation of an offer to buy the products or securities to which it applies. No representation or warranty is given as to the accuracy or completeness of the information provided.

The information provided does not constitute investment advice nor take into account the individual financial circumstances or objectives of any investor. Any information that may be provided relating to past performance is not a reliable indicator of future results or performance.

To the extent permitted by law, in no event shall Capital.com (or any affiliate or employee) have any liability for any loss arising from the use of the information provided. Any person acting on the information does so entirely at their own risk.

Any information which could be construed as “investment research” has not been prepared in accordance with legal requirements designed to promote the independence of investment research and as such is considered to be a marketing communication.