Thunder Gold Intersects 1.178 g/t Gold Over 102 Metres at Tower Mountain, Ontario
- Thunder Gold reported October 19, 2026, gold mineralization grading 1.178 g/t over 102 meters at Tower Mountain in Ontario.
- Hole TM26-221 ended outside the optimized pit limit in mineralization averaging 0.785 g/t gold over 12 meters.
- Mineralization remains open at depth, prompting an increase in planned drilling at the property.
- Hole TM26-220 intersected 0.551 g/t gold over 75 meters, 200 meters above TM26-221.
- Actual grades across 10 infill holes averaged approximately 10% above grades predicted by the 2026 mineral resource model on a length-weighted basis.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Thunder Gold Corp. published the original content used to generate this news brief via Newsfile (Ref. ID: 202610190730NEWSFILECNPR____20261019_319375_1) on October 19, 2026, and is solely responsible for the information contained therein.