Seatrium Wins MODEC Contract for Offshore Guyana Production Vessel
- Seatrium secured a MODEC contract on November 16, 2026, to integrate the Essequibo 1899 FPSO for deployment offshore Guyana.
- The scope covers topside module integration, flare tower and crane pedestal fabrication, plus commissioning support.
- The vessel has initial production capacity of approximately 150,000 barrels daily, with a planned mooring depth of approximately 1,025 meters.
- This marks the group's second FPSO integration project for MODEC offshore Guyana.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Seatrium Ltd. published the original content used to generate this news brief via Singapore Exchange Limited (SGX) (Ref. ID: 5BZO78ZDOYIWQIMV) on November 16, 2026, and is solely responsible for the information contained therein.