Goldgroup Mining Intersects 57 Meters Grading 1.02 g/t Gold at San Francisco Project
- Goldgroup Mining reported November 9, 2026, a 57-meter intercept grading 1.02 g/t gold at La Chicharra, within Mexico’s San Francisco project.
- The intercept included 4.75 meters grading 5.26 g/t gold, supporting evaluation of a potential restart.
- Drilling reached 19,556 meters by October 31, 2026, completing approximately 75% of the planned 26,000-meter program.
- Geotechnical work will establish pit-wall design criteria; mine-planning studies are evaluating optimized pit configurations under varying gold-price and operating-cost assumptions.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Goldgroup Mining Inc. published the original content used to generate this news brief via Newsfile (Ref. ID: 202611090700NEWSFILECNPR____20261109_323033_1) on November 09, 2026, and is solely responsible for the information contained therein.