AbraSilver Intersects 75 Meters Grading 2.44 g/t Gold at Diablillos Project
- AbraSilver intersected 75 meters grading 2.44 g/t gold and 106 g/t silver within the planned Oculto pit at Argentina's Diablillos project.
- At Oculto East, drilling intersected 253 meters grading 0.54 g/t gold, extending oxide mineralization largely below the current pit design.
- The results will feed into an updated mineral resource estimate expected in the second quarter of 2027.
- Phase VI drilling remains on track for completion by year-end 2026, with three rigs operating.
- A final construction decision remains scheduled for the second quarter of 2027.
Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Abrasilver Resource Corp. published the original content used to generate this news brief via Newsfile (Ref. ID: 202611090730NEWSFILECNPR____20261109_322952_1) on November 09, 2026, and is solely responsible for the information contained therein.